Page 1 of 1

Bypassing JOBCONN once

PostPosted: Wed Apr 04, 2012 5:36 pm
by dragone007
Hello,

I have Job-C which has a connection with Job-A and Job-B. Job-C is already on the Queue and is waiting. How can I modify (in batch mode)only for this run the connection temporarily so Job-C can go on ? Thanks a lot in advance

Regards
Denis

Re: Bypassing JOBCONN once

PostPosted: Mon Apr 16, 2012 6:12 pm
by sarankumar
->To add a dependent job requirement use
ADDRQ,JOB=jobname or job number,DEPJOB=job
->To ADD user req.ments
ADDRQ,JOB=job name or jon number,USR=text