out of sequence in ca7 job



Unicenter CA-7 Job Management: CA's workload automation tool for managing, visualizing, automating, optimizing applications

out of sequence in ca7 job

Postby kchidambara2 » Fri Aug 31, 2012 4:26 am

i have 2 jobs running daily in hourly basis

Job A schid(001) trigger job B (001) trigger job A schid(002) trigger job B(002)........... job A schid(23) trigger job B schid(23)

job C is a sucessor for A job.

job A ruunig 24 times by diffrent schedule id like schid=01 submit at 0001, schid=02 submit at 1, schid=03 submit at =02...... like schid= 24 submit at 23 hrs...

Job B running same as 24 times same as A by sscan mode like schid 001 submit at 1'o clock, schid 002 submit at 2'o click ...... so i can see jobs in ca7 like blow

A REQ 0402 243/1901 *NONE* 243/1910 ALL- 001 AUTO 001

------------------------- REQUIREMENTS STATUS -----------------------
_______ INTERNAL JOB=C DATE/TIME=12243/0100

after 1 hour schid 2 show like below

A REQ 0402 243/1901 *NONE* 243/1910 ALL- 002 AUTO 001

------------------------- REQUIREMENTS STATUS -----------------------
_______ INTERNAL JOB=C DATE/TIME=12243/0200

A REQ 0402 243/1901 *NONE* 243/1910 ALL- 003 AUTO 001

------------------------- REQUIREMENTS STATUS -----------------------
_______ INTERNAL JOB=C DATE/TIME=12243/0300


The Job A(schid001) which sould completed at 0001 am failed some reason and it fixed at 3'o clock (2 hours dely) .As soon as job A (schid 001) fixed at 3
it triggers job B(schid 002) runs at 3'o clk and it trigger job A (schid02) too ,

My question is now job A has two sccessor's since it running on 3.15 'o clock so it will be like this below

A REQ 0402 243/1901 *NONE* 243/1910 ALL- 002 AUTO 001

------------------------- REQUIREMENTS STATUS -----------------------
___x____ INTERNAL JOB=c DATE/TIME=12243/0200
___x____ INTERNAL JOB=C DATE/TIME=12243/0300

As per schedule Job job A(schid002) rquirment job c (schid-002)alone complete but this case job c(schid=003) also completed.
if job A (schid =04) will run or job will trap in ca7 for c(schid=003) since ran alredy .


is it called out of sequence in schedule ?, please guide me
kchidambara2
 
Posts: 9
Joined: Sat Dec 19, 2009 6:33 am
Has thanked: 0 time
Been thanked: 0 time

Re: out of sequence in ca7 job

Postby NicC » Fri Aug 31, 2012 1:51 pm

What do your scheduling group say? They are the experts and they are the ones that should be able to tell you and you can talk back and forth about the overall requirements like if a job is dead for 2 hours can you cancel/dummy the next occurrence etc.
The problem I have is that people can explain things quickly but I can only comprehend slowly.
Regards
Nic
NicC
Global moderator
 
Posts: 3025
Joined: Sun Jul 04, 2010 12:13 am
Location: Pushing up the daisies (almost)
Has thanked: 4 times
Been thanked: 136 times


Return to CA-7

 


  • Related topics
    Replies
    Views
    Last post