Trigger the Batch Job immediattly after the IPL

PostPosted: Tue Aug 21, 2012 1:04 am
by bazzigar
Hello,

Is there any way I can trigger a batch Job and associated REXX code Immediattly after the system is being IPL'ed?
Appreciate you help.We are usning OPC(TWS) here in my shope.

Thanks,

Re: Trigger the Batch Job immediattly after the IPL

PostPosted: Tue Aug 21, 2012 1:10 am
by dick scherrer
If the REXX code is run by the batch job, nothing needs to be done other than scheduling the batch job.

Suggest you talk with your scheduling people for the specifics.

If this is a test job, there may be a policy that does not allow scheduling of test jobs. . .

Re: Trigger the Batch Job immediattly after the IPL

PostPosted: Tue Aug 21, 2012 1:32 am
by bazzigar
Hi dick,

The job is scheduled to run everyday after midnight. But I need this job to run after every IPL or after every recycle of TWS/OPC atleast.

Thanks,

Re: Trigger the Batch Job immediattly after the IPL

PostPosted: Tue Aug 21, 2012 7:50 am
by dick scherrer
Hello,

Create a new job (same process with a different name) and schedule appropriately. Document what you have done and why.

Re: Trigger the Batch Job immediattly after the IPL

PostPosted: Tue Aug 21, 2012 12:48 pm
by mongan
Talk to your system people. There are a lot of tasks and things done after an IPL, so timing can be critical - your system group can help you on this.