Required Plan bind or not
Posted: Thu Aug 20, 2009 3:27 pm
Hi,
I've a program A pure cobol program. Its calling Program B which is DB2 program. Do I need to Plan bind the PROGRAM A or not.
Thanks
Tvssv
I've a program A pure cobol program. Its calling Program B which is DB2 program. Do I need to Plan bind the PROGRAM A or not.
Thanks
Tvssv